Construction on the extension of the RTD southeast light rail line has advanced to the stage of work on three major bridges. The structures will be built to carry trains over Lincoln Avenue, I-25 and RidgeGate Parkway in Lone Tree. The extension covers 2.
Back to Search Results
Login or obtain Article Access to read the rest of this content.
- Date:
September 2, 2016
- Category:
Transportation
- September 6, 2016
- Bill James